Wednesday, 7 November 2012

Update 3.0


We have actors and a plan of action!

We have decided on our actors for our clip, who will be Emily as the main Female protagonist, and Reece (the same one in our group) as the male protagonist. As we shall be filming  on Friday and Sunday, with the live performance on Friday and the Narrative section on Sunday. I need to gather the props and equipment needed for firday, like the music equipment such as drums, guitars, microphone and the stand, AMPs and other various bits and pieces. For the live performance we are thinking of filming it in one straight shot numerous times in different ways, so that we have a lot of footage to pull from incase that if a shot we do from a storyboard goes awry we can hopefully replace it from another. Our time frame of filming is this week, and we hope to be finished this week and be able to convert and edit afterwards and be able to do it efficently as possible since me and Katie both have the diting software at home.

No comments:

Post a Comment